Stena Drillmax


Stena Forth is a Drillship equipped with twin hoisting and drilling tower. 

Multiconsult was responsible for detail engineering for Drill floor (height = 23 m), Setback-structure (height = 33 m), supports for the equipment like derrick, lifting cylinders and travelling equipment, heave compensator, riser tension system etc, Lifting lugs etc.

Design calculations includes ULS and PLS analysis, FLS analysis, FEM analyses of main nodes, hand calculations of details.


Engineering services

  • Consultation
  • Structural design
  • Fatigue design
  • 3D-modelling
  • Calculations
  • Design drawings


Scop of work

  • Complete detail design
  • ULS analyses
  • PLS analyses
  • FLS analyses
  • FEM analyses


Project
Stena Drilmax - Drillship

Project type
Offshore Steel, Multidisciplinary

Client
Stena Drillmax

Period
2006 - 2007

Key Numbers
Variable deck load: 15 000 tonnes,
Drill floor: Height = 23 m,
Setback-structure: Height = 33 m,
Multiconsults assignment: 3395 tonnes 